KLA Research & Development Center
Ann Arbor, MI
Office & Cleanroom: 23,000 GSF
Parking: 153,00 GSF
ConstructionTotal: $143.5 Million
This project is a new 6 story:
- Multi-story Atrium
- Offices
- Conference Rooms
- Café
- Dining Area
- Kitchen
- Fitness Area
- Cleanroom Facility
- 68’x32’ Modules
- Cleanroom Airlock
- Labs Shelled
- Classrooms
- Data Center
- Canopies Overhung
- Utility Yard
- CEP
- Parking Deck
- 460 Spaces
- 2 Story Below Grade
University of Illinois Electrical and Computer Engineering Building
Urbana – Champaign, IL
Project: 230,000 GSF
Construction Total: $95.0 Million
New Construction included:
- 5-story building
- Instruction/research labs
- Faculty offices
- Undergraduate workstations
- 4,000 instructional cleanroom
- 400-seat auditorium
University of Virginia ITE Building
Urbana – Champaign, IL
Project: 100,000 GSF
Construction Total: $42.1 Million
The project included:
- Architectural, Civil, & Structural
- MEP
- Environmental
- Information Technology
Learning spaces:
- Faculty offices
- Support spaces
- Visualization Lab
- Teaching laboratories
- Flexible teaching spaces
- Computer Vision & Graphics Lab Certification
Building Addition:
- 6-stories
- Courtyard
- Board room
- Auditorium
- Server room
- LEED Silver
Radford University Center for the Sciences
Radford, VA
Project: 114,000 GSF
Construction Total: $40.3 GSF
KAS provided estimates for the entire project including:
- Sitework
- Structural
- Architectural
- MEP
This project included:
- Natural History Lab
- Health Sciences Lab
- Geology Museum
- Classrooms
- Planetarium
- Anthropology Dry Labs
- Biological Research Lab.
National Hurricane Museum and Science Center
Lake Charles, LA
Project: 60,650 GSF
Construction Total: $36.5 Million
New Construction
KAS estimate included:
- Architectural
- Structural
- Civil
- MEP
Waterfront areas include:
- Boat slip
- Deck areas
- Breakwater
- Open-air areas
- Walkways
- Broadcast porch
Public interior areas include:
- 32-foot high exhibition area
- 150 seat theater
- LEED projection screen system
- Visitor/Reception area
- Retail space
- Learning center/Classrooms
- Multi-purpose space
- Conference room
This 2-level structure includes:
- Lounge
- Food preparation area
- Service area
- Admin area
- Storage space
- Building maintenance space
- Shipping/receiving area
- Loading dock
University of Mary Washington Information and Technology Convergence Center
Fredericksburg, VA
Project: 76,720 GSF
Construction Total: $30.0 GSF
KAS estimated included
- Civil
- Structural
- Architectural
- MEP
- Environmental
- IT (Information Technology)
New construction included:
- 4-story building
- LEED design
- IT Technology
- Shipping/receiving
Common spaces
- Workstations
- Meeting
- Offices
- Café
Media spaces
- 200-person auditorium
- Performance
Science Museum of Virginia
Richmond, VA
Project: 60,650 GSF
Construction Total: $36.5 Million
Expansion & Renovation
Project included:
- Lower concourse
- Train shed restoration
- Exhibit space renovations
- Major redesign of existing facility
Construction included:
- Demolition
- Sitework
- Structural
- Architect
- MEP
University of Michigan Detroit Observatory
Ann Arbor, MI
Basement Level: 2,130 GSF
1st Floor Level: 4,457 GSF
Observatory 1st Floor: 333 GSF
Total Project: 6,920 GSF
Construction Total: $7.8 Milliol
Classroom & Accessibility Addition
New 3-level construction has an emphasis on accessibility
Project included:
- Civil
- Structural
- Architectural
- Sitework
- MEP Estimates
Basement level spaces
- Mechanical, Electrical, Data, & Elevator Equipment Room
- Toilet Rooms
- Janitor Space
First floor spaces
- Lobby / Reception / Grand Hall Areas
- Coat, Storage, & Multipurpose rooms
- Catering & Office supplies
- Toilet Rooms
- Green Plant Materials on Roof
Observatory 1st Floor
- Connector to existing observatory building