University of Michigan Biological Science Building – BSB
Ann Arbor, MI
Project: 295,047 GSF
Construction Total: $171.1 Million
KAS provided estimates for the entire project for the AE’s.
This project was an advanced concept master plan for new biological sciences building, including major reconfigurations to the entire site.
The project included:
- 24 PI’s per Floor
- 30 Bench Modules
- 30 Faculty Offices
- Natural History Museum
- Planetarium
University of Mississippi STEM Building
Oxford, MS
Project: 202,000 GSF
ConstructionTotal: $120.0 Million
The project includes:
- Demolition of two existing buildings
- Construction of new 5-story state-of-the-art STEM teaching spaces
- Compliant with LEED Silver building standards
New Academic Spaces
- Lecture halls
- Classrooms
- Teaching/support labs
Facility
- Commons space
- Study/instruction spaces
- Lounge/break-out spaces
- Student organization space
- Food service
- Administrative/shared office space
Building Support Spaces
- Telecommunication
- Receiving
- Maintenance
- Waste management
Estimates
- Architectural enclosures, partitions/doors, & finishes
- Civil and site utilities
- Structural
- Equipment
MEP
- HVAC & building controls
- Electrical, fire protection, alarm system, & telephone/data
- General & lab plumbing
George Mason University Robinson Hall & Harris Theater
Fairfax, VA
Project: 218,000 GSF
Construction Total: $108.2 Million
This project included:
- Demolition – Part of the existing structured was demolished
- Addition – A new structure was built in the demolished area
- New Landscaping & Courtyard created Green Spaces
Harris Theater addition
- 27 New Classrooms
- Collaborative Spaces
- Flexible Spaces
- Community Kitchens
- Conference Rooms
Academic Spaces
- Study & Research Areas
- Engineering & Science
- Arts & Humanities
Collaborative Spaces
- Workshops & Social Events
- Cultural Diversity & Awareness
- Healthy Environments & Personal Wellness
- Outdoors social spaces
Green Technology
- Energy Efficiency
- Environmental Standards
- LEED Certification
University of Michigan Life Sciences Building
Ann Arbor, MI
Project: 2,500 GSF
ConstructionTotal: $101.0 Million
Cost study included 3 options to renovate the Cryo-electron microscopy (Cryo-EM) section of the building.
The project included Architectural and MEP estimates.
The renovation would result in provide state-of-the-art research, laboratory and support spaces for three Cryo-EM microscopes.
University of Illinois ECE – Electrical and Computer Engineering Building
Urbana – Champaign, IL
Project: 230,000 GSF
Construction Total: $95 Million
New Construction
- 5-story building
- Instruction/research labs
- Faculty offices
- Undergraduate workstations
- 4,000 instructional cleanroom
- 400-seat auditorium
LEED
- 3-story solar canopy
- Rain screen system
- LED lighting
- HVAC system
University of Virginia CAS – College of Arts & Sciences
Charlottesville, VA
Project: 100,000 GSF
Construction Total: $88.9 Million
5-Story new research facility with, basement, and penthouse included:
- LEED
- Laboratories
- Conference rooms
- Laboratory support areas
- Administrative office space
University of Michigan Pathology Relocation & Renovations
Ann Arbor, MI
Ground Floor: 230,000 GSF
1st Floor: 98,796 GSF
Total Project: 142,064 GSF
Construction Total: $84.0 Million
This relocation and renovation included:
- 4 buildings
- Multi-phases project
- Code upgrades
- Loading dock improvements
- Pathology operations upgrade/enhancements
General improvements included:
- Natural light from the glass window walls
- Patient security/traceability
- People and functions flow
HVAC included:
- Labs
- Specific ventilation/exhaust
- Specialized exhaust hoods
- Office areas
Spaces included:
- Vivarium
- Laboratories
- Collaborative/Multi-functional spaces
- Staff/student spaces
- Support spaces
University of Connecticut New Engineering & Science Building
Storrs, CT
Project: 118,060 GSF
Construction Total: $68.9 Million
KAS provided estimates for the entire project including:
- Sitework
- Civil
- Structural
- Architectural
- MEP
After demolition & new construction included:
- 5 floors
- Penthouse
- Basement
- LEED “green” building criteria
The building comprised of:
- Meeting spaces
- High-tech laboratory areas
- Extensive air handling/exhaust systems
- Classrooms
Spaces included:
- Circulation space
- Computer spaces
- Meeting/gathering spaces 5 Floors:
- Lab support
- Wet/dry labs
- Service spaces
University of Michigan Law School Academic & Student Commons Addition
Ann Arbor, MI
Project: 100,000 GSF
Construction Total: $64.4 Million
New Construction & Renovation:
- Café
- Meeting areas
- Common areas
- Classroom spaces
- Combined workspaces
- Technologically support
Case Western Reserve University Performing Arts Center
Cleveland, OH
Project: 143,550 GSF
Construction Total: $64.4 Million
The arts & sciences will coexist in this building:
- Dance
- Theater
- Music
- New Technology
- Laboratory equipment
- Synagogue listed on the National Register of Historic
- Worship services continue in the sanctuary
University of Michigan South Quad Renovation
Ann Arbor, MI
Project: 143,550 GSF
Construction Total: $61.3 Million
This renovation project was a large dining facility with ethnic food specialty areas.
This renovation included:
- Student study lounges
- Music practice areas
- Toilet rooms
- Laundry facilities
- Community game spaces & common lounges
- Kitchen spaces
Virginia Commonwealth University (VCU) Cabell Library & Academic Commons
Richmond, VA
Project: 156,000 GSF
Construction Total: $50.8 Million
Project highlights:
- Faculty & graduate research center
- 300-seat event space
- Ground floor café
- Reading & collaborative spaces
- LEED silver certification
University of Michigan Weiser Hall
Ann Arbor, MI
Project: 106,861 GSF
Construction Total: $32.5 Million
Renovations included new:
- Lounge areas
- Vending Areas
- Library space
- Gathering spaces
- Multi-purpose teaching spaces
New construction included:
- Grand staircase
- Research areas
- Seminar spaces
- Large teaching / shared spaces
- Enclosing of existing breezeway
Old Dominion University Chemistry Building
Norfolk, VA
Project: 115,400 GSF
Construction Total: $60.2 Million
KAS provided estimates for the entire project including:
- Sitework
- Civil
- Structural
- Architectural
- MEP
This project included:
- Academic and research
- Planetarium
- Break rooms
- Offices
- Conference rooms
- Instructional labs
- General chemistry
- Organic chemistry
- Analytical, physical
- Biochemistry