Headquarters

Visteon Village Corporate HQ

Romulus, MI

Project: $324 Million

Corporate Campus

  • LEED Certified
  • 9 separate buildings
  • Nine clustered facilities
  • Community-style environment

Facilities

  • Offices
  • Technical
  • Training
  • Prototype manufacturing
  • Product/development engineering

KLA Research & Development Center

Ann Arbor, MI

Office & Cleanroom: 23,000 GSF
Parking: 153,000 GSF
ConstructionTotal: $143.5 Million

This project is a new 6 story:

  • Multi-story Atrium
  • Offices
  • Conference Rooms
  • Café
  • Dining Area
  • Kitchen
  • Fitness Area
  • Cleanroom Facility
  • 68’x32’ Modules
  • Cleanroom Airlock
  • Labs Shelled
  • Classrooms
  • Data Center
  • Canopies Overhung
  • Utility Yard
  • CEP
  • Parking Deck
  • 460 Spaces
  • 2 Story Below Grade

Commonwealth of Virginia 8th & 9th Street Office Building

Richmond, VA

PROJECT
8th Street: 300,000 GSF
9th Street: 183,167  GSF
Garage: 110,000 GSF
ConstructionTotal: $133.3 Million

New Construction

8th Street Building

  • Demolition the existing building
  • Build a new 11 office building
  • Reuse historical materials from the demolition
  • Build a new 4 level, 270 car below deck parking garage

Renovation

9th Street Building

  • Renovate the existing Office Building
  • Maintain the character of the existing building

New Services

  • Chilled water & hot water plant
  • Electrical service

Silver LEED Certification

Dominion Workplace Tower I

Richmond, VA

PROJECT
Office/Amenity areas: 
627,000 GSF
Parking areas: 330,000 GSF
Total: 957,000 GSF

This project included:

  • New office tower with a parking garage, retail, amenity, and public spaces
  • 21 levels above ground including:
  • Ground floor lobby and amenity floor
  • Mezzanine level
  • 2 additional amenity floors
  • 17 office floors
  • Parking garage with 886 parking spaces
  • 2 levels of the parking garage are above grand
  • 4 levels are below grade

LEED Gold certification specifications

Little Caesars Global Resource Center, Shell & Core

Detroit, MI

Project: 247,554 GSF
Construction Total: 
$59.1 Million

High-rise Building

  • 8 Stories
  • 50 car parking lot

Level 1

  • Lobby
  • Retail Space
  • Restaurants

Level 2

  • Showroom
  • Conference & Training Center

Level 3

  • Corporate Offices
  • Conferencing & Training Areas
  • Access to Outdoor Plaza & Vegetable Roof Space

Levels 4-8

  • Corporate Spaces

Atria Spaces

  • Monumental Stair between open floors

Repurposed Former Flint Journal Building

Flint, MI

Project: 100,950 GSF
Construction Total: 
$11.5 Million

The renovation included:

  • Exam room
  • Conference rooms
  • Lecture halls
  • Apartments