Detroit Metropolitan Wayne County Airport
Romulus, MI
Terminal Building: 2,000,000 GSF
Concession & Retail Space: 125,000 GSF
Airline Sponsored Guest Facilities: 36,000 GSF
Project Total: 2,161,000 GSF
Phase II Construction: $110 Million
Midfield Terminal Demolition & New Construction: $450 Million
Concourse C Renovation: $35 Million
East Concourse Renovation: $26 Million
West Concourse Renovation: $33 Million
Construction Total: $654 Million
Phase II Construction:
- 700-FT long tunnel
- Moving walkways
- Art-glass walls
- Lighting effects
Midfield Terminal Demolition & New Construction:
- 24 luggage curbside check- in locations
- 104 domestic/international ticketing areas
- Federal Inspection Services
Concourse C Renovation:
- Colored LED lighting synchronized to music
- Eating & shopping
East Concourse Renovation:
- 66 jet arrival/departure gates
- 2 people mover trams
- 1 1/2 miles of moving sidewalks
West Concourse Renovation:
- 8 jet arrival/departure gates
- 25 arrival & departure gates
- Concessions, rest rooms, & amenities
University of Michigan Wall Street West Parking Structure
Ann Arbor, MI
Project Total: 357,508 GSF
Construction Total: $31.4 Million
New construction:
- 7-level structure
- 1,102 vehicle parking spaces including:
- Bicycles
- Motorcycles
- Moped
- Electric Vehicle Charging Stations
- Roof Top Snow melting system
Dearborn TOD New TOD Complex
Dearborn, MI
Project Total: 16,000 GSF
Construction Total: $28.2 Million
This TOD (transit-oriented design) building coordinated foot, bicycle, rail, and public transportation under one hub.
LEED Silver certification:
- Solar collectors
- Solar shading glass
- Energy efficient lighting
- Geo-thermal heating and cooling
- Electrical vehicle charging stations
- Bioswale storm water management
Phase II Construction:
- 700-FT long tunnel
- Moving walkways
- Art-glass walls
- Lighting effects
Midfield Terminal Demolition & New Construction:
- 24 luggage curbside check- in locations
- 104 domestic/international ticketing areas
- Federal Inspection Services
Concourse C Renovation:
- Colored LED lighting synchronized to music
- Eating & shopping
East Concourse Renovation:
- 66 jet arrival/departure gates
- 2 people mover trams
- 1 1/2 miles of moving sidewalks
West Concourse Renovation:
- 8 jet arrival/departure gates
- 25 arrival & departure gates
- Concessions, rest rooms, & amenities
University of Michigan Wall Street East Parking Structure
Ann Arbor, MI
Project Total: 250,000 GSF
Construction Total: $19.6 Million
New construction:
- 6-level structure
- 735 vehicle parking spaces for:
- Bicycles
- Employees
- Motorcycles
- Covered transit shelter:
- University & Municipal buses
Main Street Station Train Shed Rehabilitation
Richmond, VA
Project Total: 57,500 GSF
This renovation to this historic project included:
- Landscaping
- Extensive architectural touches
- Refurbishing historic millwork
- New roof system
- Conveying system
University of Michigan Transportation Operations Complex
Ann Arbor, MI
Project Total: 72,130 GSF
Construction Total: $29.2 Million
The Transportation Facility renovation was extensive.
The garage improved the capabilities to:
- Service
- Wash
- Paint
Variety of vehicles included:
- Sedans
- Large trucks
- Busses
Areas updated to meet current codes and facility needs included:
- Paint booths
- Welding areas
- Parts rooms
- Service support rooms
- Wash bays
- Service bays
- Training spaces
Safety and accessibility were updated to enhance operations and meet updated codes for:
- Diesel fuel
- Parts washing
- Vehicle & equipment repairs
- Storage areas
- Fuel monitoring devices
Other Renovations included:
- Office areas
- IT/communications/security
- Customer areas
- ADA requirements
- Energy efficiency
- Operations circulation
- LEED Silver Certification
University of Michigan Lay Automotive Engineering Lab
Richmond, VA
Project Total: 16,380 GSF
Construction Total: $1.9 Million
This project included:
- Interior improvements
- Blast doors
- Fume hoods
- Gas detection systems
- Concrete pits & trenching to accommodate equipment